Instagram

Showing posts with label kiln loaded. Show all posts
Showing posts with label kiln loaded. Show all posts

Monday, September 20, 2010

Kiln loading

Just finished loading the little Olympic gas test kiln. I couldn't get all the tiles in because I was short of shelves. If I could figure out how to cut just one of my old silicon carbide shelves, I'd be able to fit everything in there; but I did get the most important ones loaded.

Firing will be tomorrow when I can start it up very early. This way if I run into a shortage of gas I can refill while the dealer is open.  Olympic says it can fire to cone 10 on 5 gallons of propane but of course that may not be for a prolonged firing. I have a 7 gallon tank and have the plumbing set up with a manifold, so I can also hook up the backup 5 gallon tank at the same time. Each, of course, has it's one on/off switch and hose., so I think I should be OK.

The rest of today is going to be spent doing some glaze math and catching up with a lot of snail and email to give my sore back a rest. Dinner is going to be margaritas and a chicken, onion, garlic, tomato, and serrano chiles stir fry with re-fried beans.