Showing posts with label baking cooking afternoon. Show all posts
Showing posts with label baking cooking afternoon. Show all posts
Sunday, October 16, 2011
Nachos and margaritas
The day was so full of "have to's", that one thing just led to another and I never got the studio time I wanted other than covering the pots before breakfast, that I threw the day before.
After breakfast, I made a mushroom bisque and packed up enough for two dinners and got those in the freezer, and set a little aside for us for lunch.
Then I got the veggies prepped for our nachos dinner. By then, it was time for lunch.
After lunch I had to clean off all my tropical and other tender potted plants and move them, with a bit of Jim's help with the larger pots, into the studio till spring.
Then I headed to the garden to harvest and cover all the peppers and basil because of a frost warning. I also dug up the sweet potato bed and found out what I already thought - the critters ate all of them! Well, to be fair, they actually left me two tiny ones about the size of a small chili pepper. :-(The forest critters really helped themselves to a lot of my veggies this year - more than they ever have.
Jim and I also harvested a large amount of cherry tomatoes (which keep coming and coming). I picked what looks like the last of the green beans, some herbs for drying, one of the French pumpkins and Swiss chard for a friend.
By the time all that was done it was time to start dinner - nachos and margaritas. After dinner and double margaritas, we were ready to call it a night, and at eight o'clock we headed for the bedroom to watch our favorite Brit com "As Time Goes By", followed by an episode Inspector Lewis on Netflix. All in all, it was a very good, productive day even though I didn't get any studio work done.
Today I need to get to Banner Elk for a piece of plywood to use as a top for my new saw horses. My kiln shelves need grinding and coating and I'm planning on getting that done tomorrow since it's going to be the last, warm day this week.
Sunday, May 29, 2011
New Drying Cabinet
This is our old fridge, now living in the studio, doing duty as a drying cabinet. Since we were going away and I wasn't sure how well this would work, I covered the pots with plastic as insurance; and they did just fine.
The small Olympic gas kiln is ready to fire those re-fires as soon as I have two clear days in a row, which are in the forecast later next week. John Britt came over yesterday morning and finished installing the last couple of plumbing parts and checked it out to made sure that all was working. This is one great guy, with a big, generous heart always ready to help this old lady in need. You are a treasure John!
The garden calls this morning, after our sourdough pancake breakfast. The potatoes I heeled up again yesterday need spraying. After that my sourdough no knead bread will be ready to bake, followed by some early dinner prep.
I may even be able to squeeze in some studio tidying time today. First thing I have to do is get Jim's help and get the Olympic kiln sections back on the frame. With the TRAC tour coming soon there's a lot to be done other than re-firing some pots later in the week. With all the rain in the forecast for early this week, it looks like there will be plenty of time for the studio before the garden calls again.
Subscribe to:
Posts (Atom)

